Standardized Workshop

Production  Process 

* There are 6 workshops a piece of wood must go through before it's called a hanger. 


* Wood must stay here for at least 3 months in order to get dry----Humidity above 16 degree is not acceptable. There have lotus,  maple, beech, cedar, ash, pine, walnut ect material can choose.


* A perfect hanger will thought cutting +Sanding+making-up(Sanding and making-up will be done several times even after basement paint is done)+ 3 times painting +Assembling(logo +hook +clip )+QC( Each hanger goes out of our factory are checked and selected by six persons)+packing


mmexport1550730387236.jpg

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy